House: bureaucracy
Mar. 21st, 2008 04:59 pmI am not doing very well with keeping these progress reports up-to-date. Here it is March 21st and our story has been stalled back in January for close to two months. It has to be told, however, so that our RL friends, who have been asking, can be given some kind of idea of How Things Have Gone.
So, we very quickly went from demolition to framing, followed by a period of getting all new wiring, ducting, and plumbing. Things proceeded swimmingly for about three weeks. Then Shawn started trying to get the inspector to come over to look at the structure and the plumbing rough-in. There was some urgency to this, as he had a long-scheduled vacation coming up, and he wanted to have a pass in hand so his lieutenant could start putting up the drywall in his absence. And now let me present you with a little timeline: ( there is too much, I will sum up )
So, we very quickly went from demolition to framing, followed by a period of getting all new wiring, ducting, and plumbing. Things proceeded swimmingly for about three weeks. Then Shawn started trying to get the inspector to come over to look at the structure and the plumbing rough-in. There was some urgency to this, as he had a long-scheduled vacation coming up, and he wanted to have a pass in hand so his lieutenant could start putting up the drywall in his absence. And now let me present you with a little timeline: ( there is too much, I will sum up )